0-3
FRONT, REAR, LEFT AND RIGHT
MACHINE DESCRIPTION
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the dozer blade
visible to the front.
DESIGNATED OPERATIONS
Use this machine primarily for the following
operations:
•Excavation
•Diggingditches
•Diggingsideditches
•Leveling
•Loading
FEATURES
•Hydromountedcabminimizesvibration
•Automatictravelshift-downsystem
•Self-adjustingshoetensionsystem
•Shortpitchrubbercrawler
•Lowenginenoiseandexhaustemissions
•Electroniccontrolofauxiliaryhydraulic
circuit
•Automaticandmanualoperationforengine
deceleration
•Engineemergencystopsystem
BREAK-IN PERIOD
When the machine is new, operate the
machine for the first 100 hours (as indicated
on the hour meter) by following the
instructions below.
Using a new machine without a break-in
period will lead to quicker deterioration of
machine performance and may shorten the
machine’s service life.
•Sufcientlywarmuptheengineand
hydraulic oil.
•Avoidheavyloadsandrapidoperations.
Operate with a load of about 80% the
maximum load.
•Donotabruptlystartup,accelerate,
change directions, or stop unless
necessary.