EasyManuals Logo

YASKAWA E-II Series User Manual

YASKAWA E-II Series
341 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #303 background image
10.2 Inspection and Maintenance
10-21
10
Inspection, Maintenance, and Troubleshooting
10.2.3 SERVOPACK’s Parts Replacement Schedule
The following electric or electronic parts are subject to mechanical wear or deterioration over time. To avoid
failure, replace these parts at the frequency indicated.
Refer to the standard replacement period in the following table, contact your Yaskawa representative. After
an examination of the part in question, we will determine whether the parts should be replaced or not.
The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the factory settings before ship-
ping. Be sure to confirm that the parameters are properly set before starting operation.
Table 10.10 Periodical Part Replacement
Part Standard
Replacement
Period
Operating Conditions
Cooling Fan
4 to 5 years
• Surrounding Air Temperature:
Annual average of 30°C
• Load Factor: 80% max.
• Operation Rate: 20 hours/day
max.
Smoothing Capacitor
7 to 8 years
Relays
Fuses
10 years
Aluminum
Electrolytic
Capacitor on Circuit
Board
5 years
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents

Other manuals for YASKAWA E-II Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YASKAWA E-II Series and is the answer not in the manual?

YASKAWA E-II Series Specifications

General IconGeneral
BrandYASKAWA
ModelE-II Series
CategoryServo Drives
LanguageEnglish

Related product manuals