EasyManuals Logo
Home>ABB>Controller>IRC5

ABB IRC5 Applications Manual

ABB IRC5
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
2 Machine Synchronization
2.1.4. General description of the synchronization process
3HAC18154-1 Revision: F28
© Copyright 2004-2008 ABB. All rights reserved.
2.1.4. General description of the synchronization process
Example with a press
This example shows the very basic steps when synchronization is used for material handling
for a press.
When... Then...
the press is closed and
ready to start
a signal from the robot controller (or PLC) orders the press to
start.
the press starts open For Sensor Synchronization, the synchronization switch is
triggered and a sensor object is created in the object queue.
The robot connects to the object.
For both Sensor Synchronization and Analog Synchronization,
the robot moves, synchronized with the press, towards the
press and reaches it when the press is open enough.
the press is open enough
for the robot to enter
the robot places (or removes) a work piece in the press. The
synchronization is ended.
For Sensor Synchronization, the sensor object is then dropped
(removed from the object queue).

Table of Contents

Other manuals for ABB IRC5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRC5 and is the answer not in the manual?

ABB IRC5 Specifications

General IconGeneral
BrandABB
ModelIRC5
CategoryController
LanguageEnglish

Related product manuals