A.5.1 OAT Sensing
The GTP 59 is an OAT sensing device. The connection to this LRU is made via pre-installed lead wires,
if they are not long enough to reach the GAD 13, crimp splices can be used to extend the lead wire to the
GAD 13. The pre-installed lead wires are ten feet in length. For specific wiring information, refer to
Section 5.
This area intentionally blank