EasyManuals Logo

GE CT-9800 User Manual

GE CT-9800
510 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #101 background imageLoading...
Page #101 background image
GE MEDICAL SYSTEMS CT9800 QUICK SYSTEM
Rev. 14 Direction 18000
4-3-55
3-10 Final Mag Tape Check DTOS ONLY
Run the 6026 Reliability program for one (1) hour as follows:
a. Mount and load the DTOS tape. If necessary, refer to the DTOS Manual, Volume 1, Part 1, for
details.
b. At the prompt (==>), observe the following and type the underline responses:
==> LOAD 6026 RELI ‘CR’
LOAD
6026 RELI REV. nn
DUAL MODE TAPE RELIABILITY, REV. nn
MAX DATA BLOCK SIZE 37777
A. MOUNT SCRATCH TAPE
B. SET SWPAK AS PER 8.0
C. HIT ‘CR’ KEY TO CONTINUE
c. To dismount the DTOS tape, press RESET to take the drive off-line, press BOT to rewind the
tape, then press and hold the UNLOAD switch to wind the tape onto the supply reel.
d. Mount a 10” reel of blank tape containing the yellow write-enable ring. Press BOT to load the
vacuum columns. When the tape is at BOT, press ONLINE.
e. At the Operator’s Console, hit the ‘CR’ key. The tape should begin to move.
f. Allow the program to run for at least an hour. No errors are acceptable.
NOTE: Record errors may be due to a bad tape. To verify this mount another tape and run program again.
g. To stop the program, hold the UNLOCK switch and press RESET at the S/140 front console.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE CT-9800 and is the answer not in the manual?

GE CT-9800 Specifications

General IconGeneral
BrandGE
ModelCT-9800
CategoryMedical Equipment
LanguageEnglish

Related product manuals