GR FS9040031000000000
Checklists
confidential
D.2.5
3 Checklist for the Preset Plus feeder, SM 102/CD 102
3.1 Service activities on the Preset Plus feeder
1
4
6
5
3
9
7
2
2
8
Fig. 2 Maintenance points on the Preset Plus feeder
No. Part Maintenance work/
Maintenance location
Tool Spare
part re-
Maintenance
interval
K
quired
I II III IV V
1
Maintenance points on the preloading device:
Stop bar Clean the stop bars.
D.S./O.S.
Cloth
X X X +
2
Maintenance points on the side stops:
Bearing block of
the side stop
Lubricate 2 recessed grease
nipples.
D.S./O.S.
Grease gun;
Optimol Long-
time PD 2
X X +
3 Pile alignment Check operation.
Clean 1 adjusting spindle.
With Non-Stop: Clean 2 adjus-
ting spindles.
Cloth
X X X +
UTKSM9040044001000000
UTKSM9040044000000000003