GR FS9040005000000000
Maintenance
confidential
D.3.4
2 Service activities on the preloading device
2.1 Preloading device
1
2
Fig. 1 Place of installation of the stop bars
Place of installation
1 Stop bar D.S.
2 Stop bar O.S.
The stop bars of the preloading device are installed
in the feeder on D.S. and on O.S.
2.1.1 Cleaning the stop bars
Maintenance point description
Maintenance inter-
val
3 000 000 prints, or monthly
Maintenance loca-
tion
D.S./O.S.
Accessibility of lubri-
cating points
Move the pile in the feeder
down and remove it. Secure
the press against start-up.
Number/type/main-
tenance work
Clean the stop bars.
Tool Soft, fluffless cloth
Cleaning solution See ”Approved cleaners”.
Tab. 1
UTKFS9040001000000000
UTKFS9040001000000000002