153
Page 151
Mini-AT User Guide
INDEX
Alarms 36
Battery Packs (Installing or Changing) 28
To install batteries in Alkaline Receptacle Pack 28
Install or replace disposable battery pack 28
Backup Battery 29
To power the Mini-AT: 29
Calibration 60
2-Point Pressure Calibration (Defined) 61
2-Point Pressure Calibration Defined (Gauge Transducers) 61
2-Point Pressure Calibration Procedure (Gauge Transducers) 61
2-Point Pressure Calibration Defined (Absolute Transducers) 63
2-Point Pressure Calibration Procedure (Absolute Transducers) 63
Single-Point Pressure Calibration (Defined) 65
Single-Point Pressure Calibration (Procedure) 66
2-Point Temperature Calibration (Defined) 67
2-Point Temperature Calibration (Procedure) 68
Single-Point Temperature Calibration (Defined) 70
Single-Point Temperature Calibration (Procedure) 71
Connectors/Jumpers 8
Correction Factors to Metered Volume 13
Pressure Factor Fp 13
Temperature Factor Ft 13
Supercompressibility Factor Fpv 14
Drawing, Installation for Div. 1 (UL) Hazardous Locations 144
Drawing, Installation for Div. 2 (UL) Hazardous Locations 146
Drawing, Installation for Div. 1 (CSA) Hazardous Locations 147
Drawing, Installation with pulse output from Turbine Meter (CSA) 149
Firmware Reprogramming 77
HELP Mode 36