Maintenance work on the carrier
7.14 Hydraulic system
7 - 94 3 302 756 en Maintenance manual
GMK6400
16.11.2018
7.14.6 Taking oil samples
Reducing the
interval
• Under difficult operating conditions – at tropical or very hot locations –
you must halve the oil change interval.
Spare parts
and
tools
– A hose with a connecting piece for a gauge port.
– A sample container 0.3 litres (0.08 gal).
– Receptacle, about 5 l (1.5 gal); à p. 2 - 4.
Prerequisites – The engine must not be running and must be secured against unauthor-
ised use; à p. 2 - 3.
Selecting the sam-
pling location
To determine the usability of the oil, you must take a sample from the
hydraulic system. To do that you must connect the hose with the connecting
piece to a gauge port.
• Remove the cover (3).
The gauge port (1) is located on the
cylinder (2) of the outrigger.
• Clean the gauge port before connecting the
hose.
M 12
Hose lengths GROVE part no.
1 m (3.3 ft) 01923003
2 m (6.6 ft) 00551941
4 m (13.2 ft) 01923139
GROVE part no.
One set of sample containers with a protective mailing
bag and delivery note to the contracted laboratory
03141012

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK6400 and is the answer not in the manual?

Manitowoc GROVE GMK6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals