Maintenance work on the carrier
7.8 Axle lines
16.11.2018
Maintenance manual 3 302 756 en 7 - 63
GMK6400
7.8.5 Final drives – Checking the oil level
Spare parts
and
tools
Prerequisites – The truck crane must be raised on outriggers and must be level.
– The engine must not be running and must be secured against unauthor-
ised use; à p. 2 - 3.
– The parking brake is released.
Checking the
oil
level
• Check the oil level at all final drives in the
same way.
• Turn the wheel until the marking (2) is hori-
zontal and is on the right, next to the centre
of the axle.
• Unscrew the screw (1).
• Check that the oil level is at the mark (2).
• Fit a new gasket and tighten the screw.
If the oil level is too low
• Top up the oil; à p. 7 - 66.
M 1
Designation Quanti-
ty
GROVE part no.
Gasket 24 x 29 Cu DIN 7603 8 00117145

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK6400 and is the answer not in the manual?

Manitowoc GROVE GMK6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals