Maintenance work on the superstructure
8.11 Central lubrication system
16.11.2018
Maintenance manual 3 302 756 en 8 - 89
GMK6400
8.11 Central lubrication system
8.11.1 Checking the filling level
The maintenance of the pump (1) is the
same
as the maintenance on the carrier;
à Central lubrication system, p. 7 - 107.
Connected lubricating points:
– Main hoist drum
– Auxiliary hoist drum
(if rigged and connected)
– Slewing bearing
– Telescopic boom – pivot pins,
– Derricking cylinder – pivot pin.
W

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK6400 and is the answer not in the manual?

Manitowoc GROVE GMK6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals