10-35
Chapter 10 COOLING SYSTEM
3. Cooling System - Install
Install the parts in the reverse order of the disassemble sequence. (Refer to the illustration for disassembling.)
Clean and dry well the coolant passage.
3.1 Water Pipe (Air Cooler) - Install
Apply silicone sealant to the both sides of packings between
air cooler in/out connectors and water pipes.
3.2 Water Pump and Sea Water Pump - Install
Tighten the mounting nuts to the specified torque.
Water Pump - Install
Sea Water Pump - Install
59 ± 5.9 N·m
{6 ± 0.6 kgf·m}
[43.5 ± 4.35 lbf·ft]
18.6 ± 2.95 N·m
{1.9 ± 0.3 kgf·m}
[13.7 ± 2.2 lbf·ft]
Rear plate