5-28
DSR-2000A/2000AP
5-3-4. Tape Path Adjust
Executes the adjustment of the tape path.
(1) TRACKING ADJUST
For adjustment of “TRACKING ADJUST”, refer to section 8-1,
8-2, 8-4, 8-5, 8-6, 8-7, and 8-8.
(2) RF SWITCHING POSITION
For adjustment of “RF SWITCHING POSITION”, refer to section
8-3.