CUR R E N T S EN S ORS PR IM AR Y T E ST ING
28 1VLG5 000 17 C
Step 6/7
Check current metering for the phase and measured current in other phases on the protec-
tion relay LHMI Measurements view.
Current must be zero in phases which are not under the primary injection test.
Figure 40: Measurements view
Io-Ain Measurements view is a measured value, not a calculated one.
Step 7/7
After testing of all 3 phases, install the back-overpressure relief flap. Set up the Ith limiter and
verify its function in the switchgear panel.
Protection functions trip the signal block Tripping coil supervision function.

Table of Contents

Other manuals for ABB UniGear Digital

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB UniGear Digital and is the answer not in the manual?

ABB UniGear Digital Specifications

General IconGeneral
BrandABB
ModelUniGear Digital
CategorySwitch
LanguageEnglish

Related product manuals