INT ER LOCKS BE TW EEN PANE LS AP PAR ATUS CO NTR O L TESTING
60 1 VLG 5000 17 C
Step 2/11
On the protection relay LHMI (upstream circuit breaker such as the Incomer, Generator and
Bus tie receiving the ARCSARC trip signal) go to -> Main Menu/Test/IED test
Test mode = IED test
The ready LED is flashing when the protection relay is in test mode.
Figure 92: Entering test mode
Step 3/11
On the protection relay LHMI (tested feeder) go to -> Main Menu/Test/IED test
Test mode = IED test
The ready LED is flashing when the protection relay is in test mode.
Step 4/11
Close all circuit breakers in the relative section. Check all the circuit breakers status on the
protection relay LHMIs.
Figure 93: Single line diagram, the circuit breaker is closed and in the service position

Table of Contents

Other manuals for ABB UniGear Digital

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB UniGear Digital and is the answer not in the manual?

ABB UniGear Digital Specifications

General IconGeneral
BrandABB
ModelUniGear Digital
CategorySwitch
LanguageEnglish

Related product manuals