12. Card Cage
12. CARD CAGE
Overview
• Fan controller board
• Integrated Cinema Processor (ICP) board
• HD-SDI board + link decryptor
• Cinema controller board
• Removing a board in the card cage
• Inserting a b oard in the ca rd cage
• Replacement of the RTC battery of the ICP board
• Battery replacement on the Cinema C ontroller Board
• Removing the button unit
• Installation of the button unit
• Replacement of the Button m odule (first ge neration K eypad)
• Replacement of the K eypad (first g eneration Keypad)
• Replacement of the Keypad assembly (second generation K eypad)
• Replacement of the signal back plane
• Replacement of the Link Decryptor
• Authorization to clear security warning on the projector
• Replacement of the Status Light
R5905043 DP2K-12C/11CX 19/02/2018
207