EasyManuals Logo
Home>GE>Laboratory Equipment>AKTApure

GE AKTApure User Manual

GE AKTApure
522 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #172 background imageLoading...
Page #172 background image
Validate purge
Follow the instructions below to check that there is no air left in the pump after performing a purge.
ActionStep
In the Process Picture:1
Click on the Injection valve and select Direct inject.
Result: The Injection valve switches to direct inject position.
Make sure that the pump flow is on.2
In the Chromatogram pane:
Check the PreC pressure curve.
3
If the PreC pressure does not stabilize within a few minutes there may be air left in the
pump. Refer to Section 8.6 Troubleshooting: Pumps, on page 387.
End the run
Click the End button in the System Control toolbar to end the run.
172 ÄKTA pure User Manual 29119969 AB
5 Operation
5.4 Prime inlets and purge pump heads
5.4.2 Sample pump

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTApure and is the answer not in the manual?

GE AKTApure Specifications

General IconGeneral
BrandGE
ModelAKTApure
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals