EasyManuals Logo
Home>GE>Laboratory Equipment>AKTApure

GE AKTApure User Manual

GE AKTApure
522 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #304 background imageLoading...
Page #304 background image
ActionStep
Fill a syringe with approximately 10 ml of the first pH standard buffer. Connect the syringe
to the Luer connector of pH valve port Cal, and inject the buffer.
4
When the Current value is stable, click the Calibrate button.5
Wash the pH flow cell by injecting water into pH valve port Cal using a new syringe.6
Enter the pH of the second pH standard buffer in the pH for buffer 2 field.7
Repeat steps 4-6 using the second pH standard buffer.8
Result: The calibration date and time are displayed in the dialog, along with values for
Calibrated electrode slope and Asymmetry potential at pH 7.
Is the Calibrated electrode slope 80% and the Asymmetry potential at pH 7 inside
the interval ± 60 mV?
9
If Yes: Click the Close button to switch the pH valve back to the default position and
to close the Calibration dialog.
If No: Clean the pH electrode and repeat the calibration procedure. If this does not
help, replace the electrode.
304 ÄKTA pure User Manual 29119969 AB
7 Maintenance
7.7 Calibration procedures
7.7.1 Calibrate the pH monitor

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTApure and is the answer not in the manual?

GE AKTApure Specifications

General IconGeneral
BrandGE
ModelAKTApure
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals