EasyManuals Logo
Home>GE>Relays>b30

GE b30 Technical Reference Manual

GE b30
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #129 background imageLoading...
Page #129 background image
Frame
5-3
Document no. 2044677-001
2 Frame
2.1 Memory
The Frame menu includes frame-specific service
menus.
A service menu to check the status of the
memory used in the CPU board of the monitor.
Test Memory tests the condition of the
EEPROM/Flash memory component of the CPU
board. If the result of the test is Fail, see section
“Error messages” in chapter “CPU.”
Test SRAM tests the Static RAM memory of the
CPU board in a similar way as the
EEPROM/Flash memory. If the result of the test
is Fail, see section “Error messages” in chapter
“CPU.”
Real-time clock test is run at every start up and
also during the operation of the monitor. If the
result of the test is Fail, the battery for the SRAM
timekeeper should be replaced.

Table of Contents

Other manuals for GE b30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE b30 and is the answer not in the manual?

GE b30 Specifications

General IconGeneral
BrandGE
Modelb30
CategoryRelays
LanguageEnglish

Related product manuals