Figure 8-10 Installing a PVDU-150A1 ground cable
(1) Cabinet ground bar or ground screws on the rack
----End
8.7 Installing an SSU
Prerequisites
● If an SSU is required, perform the following steps to install it.
● If the PVDU has space for SSUs, install the SSUs in the PVDU.
● If the PVDU does not have space for SSUs, install the SSUs in a module space in
the ETP48600-C5B1.
Procedure
Step 1 Install an SSU.
Figure 8-11 Installing an SSU
----End
PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide 8 Installing Components
Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd. 93