Figures
1. SAN Volume Controller 2145-SV1 front panel 3
2. SAN Volume Controller 2145-SV1
operator-information panel ........ 4
3. SAN Volume Controller 2145-SV1 rear-panel
indicators ............. 6
4. Fibre Channel LEDs .......... 7
5. SAS port LEDs ............ 8
6. SAN Volume Controller 2145-SV1 AC, DC, and
power-error LEDs ........... 9
7. Identify button and LED ........ 9
8. Ethernet ports on the system board .... 10
9. Ethernet port LEDs on the system board 10
10. Ethernet port LEDs on a 10 Gbps Ethernet
adapter .............. 11
11. Connectors on the rear of the SAN Volume
Controller 2145-SV1 .......... 11
12. Power connector ........... 12
13. SAN Volume Controller 2145-SV1 service ports 12
14. SAN Volume Controller 2145-SV1 unused
Ethernet port ............ 13
15. Fibre Channel port numbers in a typical
configuration ............ 14
16. Ethernet port numbers for iSCSI
communication ........... 14
17. Parts provided for SAN Volume Controller
2145-SV1 hardware installation in a rack ... 16
18. Identifying rack space ......... 19
19. Detaching the inner rail section ...... 19
20. Attach inner rail section to chassis ..... 20
21. Install the bracket assembly to the frame 20
22. Insert the chassis into the rack ...... 22
23. Parts for installing the SAN Volume Controller
2145-SV1 CMA assembly ........ 23
24. Reversing the orientation of the assembly 24
25. Install the inner member ........ 24
26. Install the outer member ........ 24
27. Install the other outer member ...... 25
28. Ethernet ports on the rear of the SAN Volume
Controller 2145-SV1 .......... 26
29. Fibre Channel ports .......... 26
30. SAN Volume Controller 2145-SV1 front panel 27
31. SAN Volume Controller 2145-SV1
operator-information panel ....... 28
32. Expansion enclosure support rails ..... 29
33. Installing the rail spring ........ 30
34. Hole locations in the front of the rack .... 31
35. Opening the hinge brackets ....... 32
36. Closing the hinge brackets ....... 32
37. Removing enclosure end caps ...... 33
38. Inserting the enclosure into the rack .... 34
39. SAS cable connector orientation ...... 35
40. Connecting the SAS cables ....... 36
41. Features on the front of the 2145-92F
expansion enclosure.......... 50
42. Front fascia of the 2145-92F expansion
enclosure ............. 51
43. Features on the rear of the 2145-92F expansion
enclosure ............. 51
44. 2145-92F support rails ......... 52
45. 2145-92F CMA assemblies........ 53
46. Tray containing expansion enclosure parts 54
47. Packaging materials .......... 55
48. Packaging for fascia.......... 56
49. Releasing the 2145-92F cover ....... 57
50. Removing the 2145-92F cover ...... 57
51. Support rails ............ 58
52. Detaching the inner rail section ...... 59
53. Screw locations to attach the inner rail to the
enclosure ............. 59
54. Attaching the inner rail section to the
enclosure ............. 60
55. Installing the rail assembly to the rack frame 60
56. Example of required rack space ...... 61
57. Example installation of the enclosure in the
rack ............... 67
58. Replacing the 2145-92F enclosure in the rack 68
59. Expansion canister .......... 69
60. Install the expansion canister....... 70
61. Upper and lower cable-management arms 71
62. Connectors for the upper cable management
arm ............... 72
63. Components of the lower CMA assembly 73
64. Upper and lower CMA assemblies moved
aside ............... 74
65. Lower CMA assembly moved ...... 74
66. Release the upper CMA assembly ..... 75
67. Release the lower CMA assembly ..... 75
68. Upper and lower cable-management arms 76
69. Upper and lower cable-management arms 76
70. Connectors for the cable management arm 77
71. Install the inner connector of the upper CMA
to the inner member of the support rail ... 77
72. Install the inner connector of the upper CMA
to the inner member of the support rail ... 78
73. Attach the support rail connector of the upper
CMA to the right support rail ...... 78
74. Comparing the location of the components of
the CMA assemblies ......... 79
75. Aligning the 2145-92F top cover...... 80
76. Replacing the 2145-92F top cover ..... 81
77. Locking the top cover ......... 81
78. Drive assembly ........... 82
79. Drive locations in a 2145-92F expansion
enclosure ............. 83
80. Correct drive installation ........ 83
81. Incorrect drive installation ....... 84
82. Replace the drive .......... 85
83. Location of secondary expander modules 87
84. LEDs on a secondary expansion module 88
85. Open the secondary expander module handles 88
86. Replace the secondary expander module 89
87. Fascia components on the expansion enclosure 90
© Copyright IBM Corp. 2014, 2017 v