Table 15: Rack Requirements for the Services Gateway
SpecificationsRack Requirements
A 19 in. (48.3 cm) rack as defined in Cabinets, Racks, Panels, and
Associated Equipment (document number EIA-310-D) published by the
Electronics Industry Association (http://www.eia.org).
Rack size
•
The outer edges of the mounting brackets extend the width the chassis
to 19 in. (48.3 cm).
•
The front of the chassis extends approximately 0.5 in. (1.27 cm) beyond
the mounting brackets.
•
The maximum permissible ambient temperature is 40°C.
Rack requirements
•
The holes within each rack set are spaced at 1 U (1.75 in. [4.5 cm]).
The device can be mounted in any rack that provides holes or hole
patterns spaced at 1-U (1.75 in. [4.5 cm]) increments.
•
The mounting brackets and front-mount flanges used to attach the
chassis to a rack are designed to fasten to holes spaced at rack
distances of 1 U (1.75 in.).
•
The mounting holes in the mounting brackets provided with the device
are spaced 1.25 in. (3.2 cm) apart (top and bottom mounting holes).
Spacing of mounting
bracket and flange
holes
Always secure the rack in which you are installing the services gateway
to the structure of the building. If your geographical area is subject to
earthquakes, bolt the rack to the floor. For maximum stability, also secure
the rack to ceiling brackets.
Connecting to the
building structure
Related
Documentation
General Site Guidelines for Installing the SRX220 Services Gateway on page 29•
• Site Preparation Checklist for the SRX220 Services Gateway on page 27
• SRX220 Services Gateway Cabinet Requirements on page 29
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX220 Services
Gateway on page 31
Clearance Requirements for Airflow and Hardware Maintenance of the SRX220 Services
Gateway
When planning the installation site for the SRX220 Services Gateway, you need to allow
sufficient clearance around the rack or cabinet where you are planning to install the
device.
When planning the installation site for the services gateway, consider the following:
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted.
•
For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the device. Allow at least 24 in. (61 cm) both
in front of and behind the device.
31Copyright © 2012, Juniper Networks, Inc.
Chapter 5: Site Preparation