. . . . .
SYSTEM OPERATION
System Startup
TP04300 Series Interface & Applications Manual 3-15
System Startup
CAUTION
CAUTION 3: Before connecting the TP04300 to its electrical source, check that the ~ (ac)
voltage and frequency to be supplied to the TP04300 are correct for those listed on its data
plate (located on system frame, rear panel).
Procedure
Step Action
1 Plug the ac power cord into a grounded receptacle which conforms to the local
electrical code, and check the ac voltage/frequency in accordance to Caution 3,
above.
2 To apply power, move breaker CB1 to the upward position (ON).
3 To interrupt power, move the breaker to a downward position (OFF).
4 Breaker CB1 is normally left in the upward
(ON) up position.
5 Check that the system is connected to the specified air source and the air is
turned on.
6 Check that the Vertical Stand lock is unlocked, to allow Stand/Manipulator
Arms to travel up/down and to allow air flow.
7 Toggle the front panel ON/Off switch downward to start operation of the
TP04300. The ON indicator light will illuminate.
8 The Startup Screen then displays: "Please wait until the system initializes"
43-Start.JPG
9 The TP04300 ThermoStream Control Software (TSCS operating system) will
then boot, displaying functional screens.
10 Listen to hear a quiet "whoosh" as the Air Dryer cycles every 60 seconds.