EasyManuals Logo

Zetor MAJOR CL User Manual

Zetor MAJOR CL
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #98 background imageLoading...
Page #98 background image
Service inspections
Service inspections are performed as follows:
The
first service inspection at the state of the engine hour counter of 100 EH maximum, but not later than
6 months after commissioning of the tractor. The second service inspection after covering another 400 EH
(at the state of the engine hour counter of 500 EH maximum) but not later than 12 months after the first
service inspection. Next service inspections always after covering another 500 EH but not later than 12
months after the previous service inspection. The service inspections are a part of tractor maintenance. The
services authorized by Zetor will provide professional performance of service inspections according to the
manufacturer's instructions.
Before starting the engine
Checking the oil level in the engine
Checking the amount of the cooling liquid and tightness of connections in the cooling system
Checking the oil level in the gearbox and final drive housing
Checking the air pressure in all tyres
Checking the tightening of wheels
Checking the state of the tractor-drawn and connecting equipment
After starting the engine
Engine greasing function check (control)
Charging function check (control)
Steering function check (control)
Steering circuit function and tightness check
Efficiency and function of tractor brakes check
Efficiency and function of trailer or semi-trailer brakes check
Steps taken after every 100 hours of operation
Maintenance of the dry air cleaner (daily when using front-mounted implements)
Lubrication of the tractor according to the lubrication schedule.
Cleaning the cooler plates with air pressure.
Checking the oil level in the gearbox housing and final drive housing.
Checking the oil level in the reductors and in the housing of the front drive axle.
Draining of condensate from the air reservoir.
Cleaning and painting of clamps of the accumulator battery with a thin layer of lubricating oil.
Defecation of the coarse filter of fuel.
Checking the oil level in the gearbox housing of the front PTO shaft.
Steps taken after every 500 hours of operation
Steps performed every 100 hours of work
Cogged belt tension check
Hydrostatic steering system clearance check
Pivot of front drive axle clearance check
Clutch and brake pedals adjustment clearance check
Manual clutch function check
Brake function for trailer check
Air pressure system tightness and function check
Driver's seat function check, greasing moving parts with grease
Steps taken beyond 500 Mth interval
with a new tractor or a tractor after general repair
Meter of Mth state 100 500 1000 1500 2000 2500
subsequently after...hours of
ope
ration
Hydrostatic steering hoses
rep
lacement
every 3500 Mth or every
4 y
ears
Foot and manual brake
fun
ction check
o o o o o o 500
Front wheels toe-in o 2000
Replacement of the belt of
the accessories drive
3000
Replacement of the
ten
sioning roller
3000
TRACTOR MAINTENANCE
97

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zetor MAJOR CL and is the answer not in the manual?

Zetor MAJOR CL Specifications

General IconGeneral
BrandZetor
ModelMAJOR CL
CategoryTractor
LanguageEnglish

Related product manuals