EasyManuals Logo
Home>Daewoo>Automobile>MATIZ

Daewoo MATIZ User Manual

Daewoo MATIZ
1184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #53 background imageLoading...
Page #53 background image
ENGINE COOLING 1D15
DAEWOO M-150 BL2
D102D517
ENGINE COOLANT TEMPERATURE
SENSOR
Removal Procedure
1. Disconnect the negative battery cable.
2. Disconnect the lower radiator hose and drain the
coolant Draining and Refilling the Cooling System in
this section.
3. Remove the engine coolant temperature (ECT) sen-
sor.
D Disconnect the electrical connector (1).
D Remove the ECT sensor (2).
D12D518A
20 NSm
Installation Procedure
1. Install the ECT sensor.
Tighten
Tighten the ECT sensor to 20 NSm (15 lb-ft).
D Connect the electrical connector to the ECT sen-
sor (1).
2. Connect the lower radiator hose and refill the coolant.
Refer to Draining and Refilling the Cooling System
in this section.
3. Connect the negative battery cable.
D102B533
COOLANT PUMP
Removal Procedure
1. Disconnect the negative battery cable.
2. Disconnect the lower radiator hose and drain the
coolant. Refer to Draining and Refilling the Cooling
System in this section.
3. Remove the timing belt. Refer to Section 1B, Engine
Mechanical.
4. Remove the rear timing belt cover.
D Remove the bolts (1).
D Remove the rear timing belt cover (2).
D102D519
5. Remove the coolant pump.
D Remove the nuts (1).
D Remove the bolts (2).
D Remove the coolant pump (3).
D Remove the gasket.
Notice: Remove the coolant pump as shown figure (a).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daewoo MATIZ and is the answer not in the manual?

Daewoo MATIZ Specifications

General IconGeneral
BrandDaewoo
ModelMATIZ
CategoryAutomobile
LanguageEnglish

Related product manuals