Pre-Test Run Checks ESIE11-02
4–22 Part 4 – Commissioning and Test Run
3
1
4
5
1.11 Electrical Checks
Checklist The table below contains the electrical checklist.
Step Check whether...
1 The main fuses, earth leak detector and main isolator are installed.
2 The main power supply voltage deviates less than 10% from the nominal value.
3 The flow switch and pump contact are properly wired.
4 The optional wiring for pump control is installed.
5 The optional wiring for remote start/stop is installed.
Make sure that the controller is correctly programmed.
6 The optional wiring for remote cool/heat is installed.
Make sure that the controller is correctly programmed.