For details, see MM910 Management Module V100R001 User Guide.
On the MM910 CLI, run the following command:
powerstate
For details, see MM910 Management Module V100R001 Command Reference.
The following describes how to power on a compute node using the MM910 WebUI.
Procedure
Step 1 Check that the chassis is installed, the power cables are correctly connected, and the PSUs and
fan modules are in position.
Step 2 Log in to the MM910 WebUI.
For details, see 12.3 Logging In to the MM910 WebUI.
Step 3 On the HMM WebUI, choose PSUs&FANs.
The PSUs&Fans page is displayed.
Step 4 Choose PSU Management > Power Control from the navigation tree.
Figure 3-2 Power Control
Step 5 Select the compute node to be powered on, and click Power On.
The selected compute node will be powered on.
NOTE
To power on all compute nodes at a time, select the check box in the header row and click Power On.
----End
3.3 Removing a CH121 V5
Procedure
Step 1 Determine the position of the compute node in the chassis.
FusionServer Pro CH121 V5 Compute Node
User Guide
3 Basic Operations
Issue 06 (2019-08-10) Copyright © Huawei Technologies Co., Ltd. 28

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionServer Pro CH121 V5 and is the answer not in the manual?

Huawei FusionServer Pro CH121 V5 Specifications

General IconGeneral
BrandHuawei
ModelFusionServer Pro CH121 V5
CategoryServer
LanguageEnglish

Related product manuals