EasyManuals Logo
Home>IBM>Switch>SAN64B-6

IBM SAN64B-6 User Manual

IBM SAN64B-6
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
Chapter 8. Chassis replacement
The SAN64B-6 chassis is highly reliable and unlikely to fail. However, the chassis is available as a FRU
and can be replaced using the following basic tasks. Since chassis replacement is a collaborative process
between customers and SSRs please review the information provided in “Customer replacement
responsibilities” on page 69 and “IBM service replacement responsibilities” on page 77 to gain an
understanding of your specic responsibilities for this procedure.
1. “Determining the need to replace the chassis” on page 69
2. “Chassis replacement overview” on page 70
3. “Preparing for replacement” on page 70
4. “Recording critical device and SAN information” on page 71
5. “Powering down the switch” on page 74
6. “Disconnecting the cables” on page 77
7. “Remove the old switch chassis and install the new switch chassis” on page 78
8. “Reconnecting system to the network and fabric” on page 74
9. “Downloading the conguration” on page 74
10. “Verifying correct operation of system” on page 75
11. “Verifying correct conguration of the fabric” on page 76
Customer replacement responsibilities
Chassis replacement is a combined effort between the customer and the IBM System Services
Representative (SSR). Before the IBM SSR can perform the physical replacement and labeling
procedures, you must prepare your environment for chassis replacement by performing the following
tasks:
“Determining the need to replace the chassis” on page 69
“Preparing for replacement” on page 70
“Recording critical device and SAN information” on page 71
“Powering down the switch” on page 74
“Disconnecting the cables” on page 77
“Reconnecting system to the network and fabric” on page 74
“Downloading the conguration” on page 74
“Verifying correct operation of system” on page 75
“Verifying correct conguration of the fabric” on page 76
Determining the need to replace the chassis
Before replacing the chassis, verify that the replacement is necessary. Ensure that the components are
rmly seated when troubleshooting. Contact IBM support if you have any questions about whether the
chassis should be replaced. Any of the following events might indicate that the chassis requires
replacement:
One or more components do not function properly.
The psShow or fanShow commands continue to show a faulty component even though the component
has been replaced.
©
Copyright IBM Corp. 2016, 2020 69

Table of Contents

Other manuals for IBM SAN64B-6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM SAN64B-6 and is the answer not in the manual?

IBM SAN64B-6 Specifications

General IconGeneral
BrandIBM
ModelSAN64B-6
CategorySwitch
LanguageEnglish

Related product manuals