2 Installation and Wiring
-
73
-
2.4 Installation of Shaft Position Signals
In elevator control, to implement accurate landing and safe running, the car position
include the leveling switches, up/down slow-down switches, up/down limit switches,
by the shaft cables to the MCB of the controller.
Up slow
-
down switch
Up limit
switch
Up final limit
switch
Leveling plate
(floor N)
L
80 ≤ D ≤ 200
mm
30
–
50 mm
150
mm
L
>
2 ×
F3-
08
V
²
(
V
:
Rated
elevator
speed)
Top leveling
position
D
Down slow-
down switch
Down final
limit switch
L L >
2 ×
F3
-
08
V
²
(
V
: Rated
elevator speed)
Bottom leveling
position
Down limit
switch
30
–50
mm
150 mm
Arrangement of shaft position signals