EasyManuals Logo

Stiga PARK PRO 340 IX User Manual

Stiga PARK PRO 340 IX
93 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
Edition
2018
Workshop Manual
PARK PRO 340 IX
Chapter
4 Hydraulic system
Page
50
4.8 Transmission uid
4.8.1 Intervention times table
To check, top up and change the uid or change the lter, consult the following table.
Action
First
time
Then
every:
Fluid type Quantity Ref. heading
(in service hours)
Check - top up to level 50
5W-50
(SAE 75W-90)
4.8.2
Change the uid 5 200 4.2 litres
4.8.3
Replace the reservoir uid lter 5 200
4.8.4
4.8.2 Check and top-up
A
1. Position the machine on even ground.
2. Open the bonnet.
3. Read off the oil level in the reservoir. The level
should be on the line (A) and not over it.
4. Top up if necessary.
4.8.3 Change
Before proceeding to drain off the uid, carry out the following operations:
1. Run the machine at variable speeds for 10-20 minutes to heat up the transmission uid.
1. Position the machine on even ground.
1. Put the parking brake on.
1. Open the bonnet.
Drain off the uid
A
A1
A2
1. Disengage the transmission - lever (A) out
(pos. A2).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Stiga PARK PRO 340 IX and is the answer not in the manual?

Stiga PARK PRO 340 IX Specifications

General IconGeneral
BrandStiga
ModelPARK PRO 340 IX
CategoryLawn and Garden Equipment
LanguageEnglish

Related product manuals