Edition
2018
Workshop Manual
PARK PRO 340 IX
Chapter
6 Control cables
Page
71
A
B
C
C
M6 10 mm 5 Nm
1. Ret the angle ball joint (A) on the hydraulic
pump.
6.2
2. Mount the xing bracket (B) of the cable end
and tighten the nuts (C).
D E
F G
G
M6 10 mm 5 Nm
3. Screw the angle ball joint seat (D) on the wire
(E) for 6 turns, and connect the joint seat to
the ball pin.
6.2.
4. Position the sheath terminal on bracket (F)
and tighten nuts (G) by hand.
6.5.3 Adjustment
30 mm
A
1. Place a 30 mm shim (A) under the traction
pedal.
B C
C
M6 10 mm 4 Nm
2. Pull bracket (B) forward so that all clearances
are eliminated and the pedal rests against the
shim.
3. Tighten the nuts (C).