EasyManuals Logo
Home>Wacker Neuson>Excavators>E05-05

Wacker Neuson E05-05 User Manual

Wacker Neuson E05-05
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #175 background imageLoading...
Page #175 background image
BA 50Z3/6003 en – Edition 4.3 * 5003b340.fm 3-119
Operation
Loading
• Loading in confined areas with a limited angle of rotation is more efficient
☞ by positioning the truck so as to ensure maximum visibility for the driver of the machine.
• Loading material on trucks is easier and faster
☞ if the machine is at the rear end of the truck and not at the side.
Grading
• Use the stabilizer blade to fill in trenches and to grade surfaces.
Notice!
Work on level ground. Grade with the stabilizer blade first in case of sloping
ground.
Excavating trenches sideways
• The machine can be used in tight spaces for excavating trenches laterally,
☞ by rotating the upper carriage and swivelling the main boom (combined position and
movement of both).
Fig. 245: Loading
Fig. 246: Grading
Fig. 247: Excavating trenches sideways

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E05-05 and is the answer not in the manual?

Wacker Neuson E05-05 Specifications

General IconGeneral
BrandWacker Neuson
ModelE05-05
CategoryExcavators
LanguageEnglish

Related product manuals