EasyManuals Logo
Home>Wacker Neuson>Excavators>E05-05

Wacker Neuson E05-05 User Manual

Wacker Neuson E05-05
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #89 background imageLoading...
Page #89 background image
BA 50Z3/6003 en – Edition 4.3 * 5003b330.fm 3-33
Operation
3.20 Cab heating and ventilation
• The cab is fitted with five air nozzles. Each nozzle can be closed and directed
separately.
• Open or close the nozzles as required to vent or heat the cab.
• Do not place flammable or explosive material or objects near the nozzles.
• Air the cab from time to time.
Notice!
The best defrosting results for the front window are achieved by opening both noz-
zles at the front right and in the leg room.
• Direct the nozzles to the front window.
Fig. 76: Air circulation in cab (up to serial no. AH02781)
1
2
48
Ventilation (fresh air)
1st posi-
tion
Press switch 48 down one step Low fan speed
2nd posi-
tion
Press switch 48 down two steps High fan speed
OFF
Press switch 48 all the way down Fan is switched off
Fig. 77: Air circulation in cab (from serial no. AJ02777)
1
2
48

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E05-05 and is the answer not in the manual?

Wacker Neuson E05-05 Specifications

General IconGeneral
BrandWacker Neuson
ModelE05-05
CategoryExcavators
LanguageEnglish

Related product manuals