3-14 BA 50Z3/6003 en – Edition 4.3 * * 5003b320.fm
Operation
3.7 Putting into operation
Safety instructions
• Only use the steps and handles provided when entering and leaving the cab.
• Never use the controls or movable lines and cables as handles.
• Never get on or off a moving machine! Never jump off the machine.
• Refer to the corresponding lift capacity tables for the boom.
Putting the machine into operation for the first time
Important information
• The machine may only be put into operation by authorized personnel
– see chapter 2.6 Selection and qualification of personnel, basic responsibilities on
page 2-4 and
– see chapter 2 Safety instructions on page 2-1 of this Operator’s Manual.
• The personnel must have read and understood this Operator’s Manual before putting
the machine into operation.
• The machine may only be used in technically perfect condition in accordance with its
designated use and the instructions set forth in the Operator’s Manual, and only by
safety-conscious persons who are fully aware of the risks involved in operating the
machine.
• Go through the “Start-up” checklist in the following chapter.
Running-in period
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not change engine speed abruptly.
• Avoid using the machine under heavy loads and/or at high speeds.
• Avoid abrupt acceleration, braking and changing driving direction.
• Do not run the engine at high speed for extended periods.
• Strictly observe the maintenance schedules in the appendix
– see chapter 5.22 Maintenance plan (overview) on page 5-57.