2-16
Chapter 2 Basic Operation
3. Preparing the DBM-600 for Operation
3-1. Using the paper guide
Use the supplied paper guide for side stitching,
corner stitching, and side stitching/folding.
1
Loosen the knob screw of the paper
guide attached to the machine.
2
Remove the paper guide.
3
Attach the supplied paper guide.
4
Insert the two notches into the screws
as shown in the figure.
5
Tighten the knob screw of the paper
guide.
3-2. Attaching the parts for page insertion
3-2-1. Attaching the page insertion roller
When performing page insertion, replace the side-
stitching ejection rollers with the supplied page
insertion rollers.
1
Loosen the knob screw of the side-
stitching ejection roller completely.
2
Lift the folding stopper unit.
3
Pull the side-stitching ejection roller
toward you to remove it.
4
Align the notch of the page insertion
roller with the shaft.
5
Tighten the knob screw.
Once you nish the page insertion operations,
remove the page insertion rollers and attach
the side-stitching ejection rollers.