GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-123
Section 8-21
Replacement of Link Arm Cable Hook
8-21-1 Manpower
1 Person, 10 minutes.
8-21-2 Tools
Standard Phillips Screwdriver.
8-21-3 Removal Procedure
1) Remove 1 screw and remove the Link Arm Top Cover as following figure.
Figure 8-145 Removal of Link Arm Top Cover.
2) Remove 2 screws. Refer to following figure.
Figure 8-146 screw points of Link Arm Cable Hook
8-21-4 Installation Procedure
Parts to be installed in reverse order of removal.
8-21-5 Functional Check
Visual Check only.

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P9
CategoryMedical Equipment
LanguageEnglish

Related product manuals