GERAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
3-2 Section 3-2 - Set Up Reminders
Section 3-2
Set Up Reminders
3-2-1 Average Installation Time
Once the site has been prepared, the average installation time required is shown in Table 3-2 below.
Table 3-2 Average Installation Time
Description Average Installation Time Comments
Unpacking the scanner 0.5 hours
Installing the scanner / options / printers 0.5 to 1.5 hours depends on required configuration
DICOM Option (connectivity) 0.5 - 1.5 hours depends on configuration amount