EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ P9

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #498 background imageLoading...
Page #498 background image
GERAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
8-172 Section 8-43 - Replacement of DCWD ASSY
Section 8-43
Replacement of DCWD ASSY
8-43-1 Manpower
1 person, 15 minutes
8-43-2 Tools
Standard Phillips screwdriver.
8-43-3 Removal Procedure
1) Separate MPI assy from MCB and MDC. Refer to the section 8-17-8 Removal Procedure -
Separating MPI and MCB.
2) Remove 3 screws on MPI assy.
Figure 8-203 DCWD Board screw points
3) Carefully separate DCWD board from MPI assy not to damage the DCWD connector. Refer to
following figure.
Figure 8-204 Position of DCWD board connector

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P9
CategoryMedical Equipment
LanguageEnglish

Related product manuals