ATTENTION
Changes to parameters in the controller can be made from the Monitoring
tab. Refer to the Changing Parameters while Monitoring section in the
Control Building User’s Guide.
6.3
Load components from Project
Loading C300 Controller
Use the following general procedure to load a C300 Controller. The load procedure is
similar for all controller components.
Prerequisites
ï‚·
Control Builder is running
ï‚·
This procedure assumes that the C300 Controller is installed and capable of
communicating with the Server.
Considerations
Note that selecting a C300 Controller block for loading also selects the associated
CEEC300 block and IOLINK blocks.
All illustrations used in the procedure are for example purposes only.
To load a C300 Controller block and its associated blocks, perform the following steps.
Click Tools > Load. Or, click the
load button in the toolbar.
Also, you can right click on the C300
block icon to select Load.