7 Installation and Conguration
7.1 Installation Environment Requirements
7.2 Hardware Installation
7.3 Power-On and Power-O
7.4 Initial Conguration
7.1 Installation Environment Requirements
7.1.1 Space and Airow Requirements
To allow for servicing and adequate airow, observe the following space and
airow requirements:
Install the server in an access-restricted area.
Keep the area in which the server is located clean and tidy.
To facilitate heat dissipation and maintenance, keep a clearance of 800 mm
(31.50 in.) between walls and the front and rear doors of the cabinet.
Do not block the air intake vents. Otherwise, air intaking and heat dissipation
will be
aected.
The air conditioning system in the equipment room provides enough wind to
ensure proper heat dissipation of all components.
FusionServer Pro 2288X V5 Server
User Guide 7 Installation and Conguration
Issue 04 (2020-06-05) Copyright © Huawei Technologies Co., Ltd. 69

Table of Contents

Other manuals for Huawei FusionServer Pro 2288X V5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionServer Pro 2288X V5 and is the answer not in the manual?

Huawei FusionServer Pro 2288X V5 Specifications

General IconGeneral
BrandHuawei
ModelFusionServer Pro 2288X V5
CategoryServer
LanguageEnglish

Related product manuals