Figure 7-7 Installing the ball bearing rail kit
Step 5 Install the other rail in the same way.
----End
7.2.5 Installing a 2288X V5
7.2.5.1 Installing the Server on L-Shaped Guide Rails or Static Rail Kit
Before installing the server, properly install the L-shaped guide rails or static rail
kit. For details, see 7.2.4.1 Installing L-Shaped Guide Rails or 7.2.4.2 Installing
the Static Rail Kit.
FusionServer Pro 2288X V5 Server
User Guide 7 Installation and Conguration
Issue 04 (2020-06-05) Copyright © Huawei Technologies Co., Ltd. 77