Prerequisites
Conditions
● You have powered o the RH8100 V3. For details, see 6.2 Powering O the
RH8100 V3. Then you have removed all power cables from the server.
● You have removed the High-performance Fusion Console (HFC) from the
RH8100 V3. For details, see 5.10.1 Removing an HFC.
Data
● You have obtained the cabinet number and chassis number of the RH8100 V3.
● You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
● You have determined the position on the RH8100 V3 for removing a battery.
Tools
● ESD gloves
● Packaging materials, for example, an ESD bag
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Pull up the right end of the battery and remove it from the slot. See Figure 5-147.
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3