For details about how to obtain the IP address of the iBMC management network
port and how to perform operations on iBMC, see the
Huawei Rack Server iBMC
User Guide
.
Procedure
The power supply units (PSUs) are properly installed but not powered on.
When the server is in single-system mode, it is powered on with the
PSUs.
When the server is in dual-system mode, systems A and B are powered
on with the PSUs.
The PSUs are powered on, and the server is in the standby state.
When the server is in single-system mode, hold down the primary power
button on the front panel to power on the RH8100 V3.
When the server is in dual-system mode, hold down the primary power
button on the front panel to power on system A and hold down the
secondary power button on the front panel to power on system B.
In the remote management scenario, use the iBMC CLI to power on the
RH8100 V3.
When the server is in single-system mode, run the ipmcset -d
powerstate -v 1 command on the iBMC CLI to remotely power on the
server.
When the server is in dual-system mode, run the ipmcset -d powerstate
-v 1 command on the iBMC CLI of system A to remotely power on system
A and run this command on the iBMC CLI of system B to remotely power
on system B.
Use the iBMC WebUI to power on the server.
When the server is in single-system mode, log in to the iBMC WebUI,
choose Power on the menu bar, choose Power Control in the navigation
tree, and click Power On and then OK to power on the server.
When the server is in dual-system mode, log in to the iBMC WebUI of
system A, choose Power on the menu bar, choose Power Control in the
navigation tree, click Power On and then OK to power on system A. Then
log in to the iBMC WebUI of system B, and repeat the follow-up
operations to power on system B.
Verication
Check the indicator status after the server is powered on.
6.2 Powering O the RH8100 V3
This topic describes how to power o the RH8100 V3.
Scenarios
The RH8100 V3 needs to be maintained or replaced.
The RH8100 V3 needs to be relocated.
The method for powering o the RH8100 V3 varies according to the scenario.
RH8100 V3 Server
User Guide 6 Powering On and O the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 304

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei RH8100 V3 and is the answer not in the manual?

Huawei RH8100 V3 Specifications

General IconGeneral
BrandHuawei
ModelRH8100 V3
CategoryServer
LanguageEnglish

Related product manuals