Commissioning
Before switching on
6
6.1
6.1-1
EDSVF9333V EN 3.0-06/2005
6.1 Before switching on
Note!
ƒ Keep to the respective switch-on sequence.
ƒ If faults occur during commissioning, the chapter
”Troubleshooting and fault elimination” will help you.
To prevent injury to persons or damage to material assets check the
following ...
... before connecting the mains voltage:
ƒ Wiring for completeness, short-circuit, and earth fault
ƒ The ”Emergency-Off” function of the complete system
ƒ The motor circuit configuration (star/delta) must be adapted to the
output voltage of the drive controller
ƒ In-phase connection of the motor
ƒ Direction of rotation of the incremental encoder
... the setting of the most important drive parameters before enabling the
controller:
ƒ Is the V/f rated frequency adapted to the motor circuit configuration?
ƒ Are the drive parameters relevant for your application set correctly?
ƒ Is the configuration of the analog and digital inputs and outputs
adapted to the wiring?