2202MYJE-MY-C8-N_2018.02.
Chapter 3 Installation
Compound 2-stage Screw Compressor 3225**C 3.2 Installation Works
3-4
3.2.4 Preparation for Installation
Installation Space
Secure sufficient working space for easy operation, cleaning, maintenance, and inspection.
Illumination
Prepare illumination devices which allow easy operation, cleaning, maintenance, and inspection.
Ventilation
If natural ventilation is insufficient, install ventilation fans according to the relevant regulations.
Piping
Table 3-1 List of Connecting Pipes (Compressor)
High-stage discharge gas outlet
Lubricating oil inlet for low-stage bearing (journal)
Lubricating oil inlet for High-stage bearing (journal)
Oil inlet for oil injection
Oil return outlet of low-stage
Oil return outlet of High-stage
Lubricating oil inlet for low-stage capacity control (Load)
Lubricating oil inlet for low-stage capacity control (Unload)
(Unload)
Lubrication oil inlet for high-stage capacity control (Load)
Lubrication oil inlet for high-stage capacity control (Unload)
Figure 3-2 JIS20K Flange Dimensions of Compressor (mm)
16-M30×P3 (Special thread)