Specification Desc./Quantity
C Expansion tank
D Radiator
E Carburettor heating circuit
Electric fan check
KEY:
5. Fuse unit
11. Battery
31. Thermoswitch
32. Electric fan
Electric fan operation check
To carry out the electric fan operation check, pro-
ceed as follows:
- Remove the front shield.
- Disconnect the two electric terminals from the
thermoswitch and connect them together.
Cooling system Carnaby 125 - 200
COOL SYS - 234