Note
Service factor and cooling method
• Service factor according to NEMA MG-1 (if applicable)
• Cooling method according to IEC60034-6
2. Check the data entered and conrm with the "Send" button.
3. Continue to commission the equipment.
6.3.4.8 Asset Info (Motor Monitoring) - Step 7/7
Enter the asset data in the last step of the commissioning wizard.
Commissioning
6.3Commissioning with iOS
SIMOTICS CONNECT 400
98 Operating Instructions, 04/2023, A5E50161952B AL