EasyManuals Logo
Home>Toyota>Engine>1PZ

Toyota 1PZ User Manual

Toyota 1PZ
348 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #139 background imageLoading...
Page #139 background image
TURBOCHARGER SYSTEM - Turbocharger TC-15
8. INSTALL TURBOCHARGER HEAT INSULATOR
Install the heat insulator with the two bolts.
Torque: 185 kg-cm (13 ft-lb, 18 Nm)
9. CONNECT WATER BY-PASS HOSES
10. INSTALL EXHAUST MANIFOLD HEAT INSULATOR
Install the heat insulator with the five bolts.
Torque: 185 kg-cm (13 ft-lb, 18 Nm)
11. INSTALL INTAKE PIPE
(a) Connect the air hose and install a new gasket and the
intake pipe with the three bolts.
Torque: 200 kg-cm (14 ft-lb, 20 Nm)
(b) Connect boost compensator vacuum hose.
12. FILL ENGINE WITH COOLANT (See page CO-5)
13. START ENGINE AND CHECK FOR LEAKS
14. CHECK ENGINE OIL LEVEL

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toyota 1PZ and is the answer not in the manual?

Toyota 1PZ Specifications

General IconGeneral
BrandToyota
Model1PZ
CategoryEngine
LanguageEnglish

Related product manuals