GUID-70854B38-25A3-472A-90D9-A09CFE3D5F96 V1 EN
Figure 5: Help menu – Update Manager
2. Select Show All Available Updates from the drop-down list in the top left corner.
3. Browse for the required connectivity package.
4. Click Download.
5. Click Install when the download is complete and follow the steps in the
installation wizard.
4.2 Activating connectivity packages
The IED connectivity package has to be installed before activating the connectivity
packages.
1. Activate the appropriate connectivity package in the Update Manager after the
installation.
The Update Manager shows the IEDs that are compatible with the installed
PCM600 version.
2. Select IED Connectivity Package REF615R Ver. n (n = version number) to use
REF615R.
Always use the latest version of the connectivity package.
Section 4 1MRS240044-IB A
Setting up a project
28 REF615R
Engineering Manual