7.10.12.3 [Batch] - [Initial concentration]
Fig. 68: Batch - [Initial preparation]
1.
[Call up the Main menu] :
Ä
Chapter 7.7 ‘Main menu’ on page 73
2.
[Select Configuration] :
Ä
Chapter 7.10 ‘Overview - Configuration’ on page 92
3. Use the scrollbar to scroll to the [menu item Batch] .
4. [Select Batch] .
ð
Screen switches to the selection level [Batch]
5. ‘Select Initial concentration
’ .
ð
The option field ‘Initial concentration’ is marked.
6.
[ Click Next] to save the setting.
ð
Screen change for the setting: ‘Initial concentration
’ / ‘W
ater quantity’.
7. Enter the quantity in litres using the scrollbar
.
8.
[ Click Next] to save the setting.
ð
Screen change for the setting: ‘Initial concentration
’ / ‘Concentration
’.
9. Enter the concentration in percent (%) using the scrollbar
.
10. ‘Select concentration after the decimal point
’ .
11. Enter the concentration in percent (%) (after the decimal point) using the scrollbar
.
12.
[ Click Next] to save the setting.
ð
Screen change for the setting: ‘Initial concentration
’ / ‘Metering time’.
13. Enter the metering time in minutes using the scrollbar
.
14.
Press the button.
ð
The setting is saved, and the screen switches back to the batch overview
.
15.
Press the button to return to the menu: [Configuration].
16.
By pressing the button, you can return to the [main menu].
17.
By pressing the button, you can return to the [operating display].